OUTLINE OF PROJECTS COMPLETED
S/N | CLIENT | PROJECT | SCOPE OF WORK |
CONSULTANTS |
1. | John Holts Investment Limited. Lagos | CEO Mr. Ezeh’s residence, Ikoyi.
Completed(1989) |
Investigation of persistent faults affecting lighting and power outlets including the swimming pool.
Report submitted. Re-installation carried out based on report including rearrangement of switchgears and Earthing. Supply of 4yrs backup spares of lamps, etc.
|
Serv. Engineers:
Engr. E.O. Oshokoya |
2. | The BrethrenChurch Ejigbo | Ejigbo Fellowship
Centre Electrical Services December Completed (1990.) |
Building services for electrical, Specification of Public Address System.
|
Serv. Engineers:
Engr. E.O. Oshokoya
|
|
||||
3. | Mr. Olashore Chairman Lead Merchant Bank. | Up grading of Power Supply System and refurbishment of electrical installation of family house at Ijebu-Ijesha. July Completed
(1990) |
Study conducted which involved a 3-day power supply monitoring exercise of NEPA supply intake voltages at different times of each day.
Extensive re-wiring and a distribution of power supply. Electrical installation works at new chalets. Supervision of installation of 100KVA generating set and air-conditioning units. |
-Ditto –
-Ditto – |
4. | NAPIMS, Victoria Island | GM’s official Residence
Completed (1991) |
Re-wiring of new residence including Central TV System installation. Maintenance of Electronic Appliances. |
connect point associates |
5. |
Mr. O. A. Smith(MD, Lead Bank Ltd) |
Electrical & Mechanical services for 2nos building projects at Ikoyi.
(1995) |
Design, specification and supervision only. Production of drawings, sourcing sourcing of specified fittings, testing and commissioning. Lightning Protection & Earthing carried out by OSHEA.
|
Engr. E.O. Oshokoya |
6. | Mr. Oladele | New Residence Victoria Island
Completed(1993) |
Design for Electrical & Mechanical services for the building. Installation work for the Electrical Lighting, power, Central TV system and Lightning Protection & Earthing. Supply of back – up spares for installed lamps.
|
Architects:
Arc. Dapo Sonola.
Serv. Engineers: Engr. E.O. Oshokoya |
7. | UnionTrust Building Society. | UTBS Properties development at Festac town. Electrical Installation works.
Completed (1994) |
Electrical Installation works for 2nos building & quarters.
|
|
8. | Mr. J. Iwanefu | Building Development at Agege. Electrical services Design & Installation. | Design and installation of Electrical services for the building.
|
Consultants.
Connect Point Associates |
9. | The Brethren Church Ejigbo. | Development of 3-floor office/ Fellowship Centre Complex.
Electrical & Mechanical Services. Completed (1994)
|
Building Services (E&M) Consultancy work – Design, specification & Supervision.
Installation work for Electrical Services Lightning, power Installation layout for printing works, Sound System Engineering Design and installation and Central TV Broadcast System
|
Architects:
Arc. Dapo Sonola.
Serv. Engineers: Engr. E.O. Oshokoya
|
10. | Prince Olashore | The Olashore’s house at Ijebu-Ijesha. Electrical Works.
Completed(1994) |
Upgrading of supply to Boys’ quarters, rewiring and segregation of main house installation of Distribution Boards and protective devises.
|
Architects:
APECO Ltd.
Serv. Engineers: Engr. E.O. Oshokoya
|
11. | UnionTrust Building Society. | UTBS cash centre at Alaba. – Electrical Installation Works.
Completed(1994). |
Rewiring and replacement of bad lighting fittings & Earthing of the newly acquired cash centre at Alaba.
|
Consultants.
Connect Point Associates |
12 | PRINCE O. OLASHORE DEVELOPMENTS, ILOKO – IJESHA | |||
A] | Residential Building Service | Electrical and Mechanical Installation works at Prince Olashore’s residential building at Iloko – Ijesha, OshunState.
Completed(1994) |
Design of Electrical and Mechanical for the building. Installation work for Electrical Services lighting, power, central TV system, speaker systems, cable satellite power supply, lightning protection and earthing.
Mechanical services piping works and installation of mechanical fittings.
|
Architects:
Olumide Esho & Partners
M&E. Engineers: Engr. E.O. Oshokoya |
B] | Boy’s Quarter’s | Electrical and Mechanical installation works at the Olashore’s boy’s quarter development project at Iloko – Ijesha, OshunState.
Completed(1994) |
Commissioned to carryout Electrical and Mechanical Installation works.
Electrical works: – Conduit wiring of lighting and power supplies. Earthing installation.
Mechanical works: – Piping and wares installation.
|
-Ditto – |
13. | OLASHOREINT’LSCHOOL, ILOKO – IJESHA | |||
A] |
Generator Project |
Generator Installation, upgrading and rearrangement of power supply distribution at the Olashore International School Site, Iloko.
Oct. 1994 – Feb. Completed(1995)
|
Installation of a 500KVA generating set and 1000AMV switchboard, cable upgrading. Rearrangements of power supply distribution to the school and residential sites.
|
Architects :
Klif Consultants Ltd.
Serv. Engineers: Building Consultants Ltd.
|
B] | Laboratory Block Project | The school laboratory block –Electrical Installation works at the OlashoreInternationalSchool, Iloko. Jan.
Completed (1995). |
Electrical Installation works of the Laboratory Block; conduiting, wiring of lighting, power points switchgears. Lightning / Earthing installation.
|
-Ditto – |
|
||||
C] | External Electrical Power Infrastructural Projects. | External Electrification at the OlashoreInternationalSchool, Iloko.
Completed (1995). |
Installation of feeder pillars, switch – gears, armoured cabling to existing staff bungalows, filtration plant and water pumps.
Installation of feeder cables to classrooms and the hostel blocks plus other general electrification works at the school site.
|
Architects:
APECO Ltd
Serv. Engineers: Building Consultants Ltd |
14. | UnionTrustBuilding Society. | UTBS Bonanza Flats at
Ijegun. Electrical installation works. Completed. (1994).
|
Electrical Installation Works for 3nos. Flats.
|
|
15. | Phama – Deko Plc., Agbara | (a) Supply &
Installation Ultra –Violet Tube Cartridges for water Supply filter. Water Treatment plant – proposal & planning.
(b) Supply & Installation Of Air-Conditioner units and janitorial equipment.
(c) Supply& Installation of lightning protection for the administrative building. Completed |
Supply of Filters & Installation.
This involved Electrical Cabling for the sockets, A/C and Mop-buckets, etc. for the janitorial equipment.
|
|
(1995) | ||||
16. | Timberwood Limited Oregun. | Wood Processing Factory & Kiln Services Industry. Electrification at 11KV Level.
Electrical & Plumbing Installation services. Completed (1995) |
Liaison with plants & Machinery’s suppliers, Messrs. Wadkin, Leincester, UK.
Planning and Design of Electrical Supply. Requirements from HT level. Installation of 300KVA Transformer and station. Installation of 300KVA Generator, Electrical Installation of Factory (internal & external infrastructure wiring), Lightning protection Fire Alarm Detection & Fighting System. Plumbing Installation for water supply and compressed air for Wood Processing Factory and the Kiln. |
Architects
Akin Ogunkeye Partnership
Quantity Surveyors. TAM Consultancy Services
M & E Engineer Engr. E.O. Oshokoya
|
17. | Olashore Int. Sc. Iloko – Ijesha | External Electrification (phase ii ) October Completed
(1995) |
Electrical Network Power Supply distribution for new classrooms, hostels and staff quarters. Installation of armoured cables feeder pillars and isolators. | Architects:
Klif Consultants
Serv. Engineers: Building Concultants Ltd
|
18. | Prince Olashore Villa, Ijebu – Ijesha. | Upgrading and rectification of electrical and mechanical installation works .completed
Completed (1996) |
Mechanical & Electrical upgrading of former installation works. – conduiting, wiring of lighting and power points. Cold water supply and drainage system.
|
-Ditto – |
19. | Miracle Life Centre, Ibadan | Electrical design and installation Completed
(1996). |
Electrical design and installation works – conduiting, wiring of lighting and power points & control gears (labour only).
|
Services Engineers Connect Point Associates |
20. | Olashore Int. Sc. Main Hall, Iloko. | Electrical installation works for the school Hall.
Completed (1996) |
Electrical installation – conduiting, wiring of lighting and power points installation fittings and control gears.
|
Services Engineers Oshea Projects Ltd |
21. | Elohim Furniture Factory Ikeja.
(First Continental Ltd ) |
Electrical design and installation for the Wood Processing Factory.
Completed (1996) |
Electrical design and installation -design conduiting, trunking, wiring of lighting and power points, fittings and switchgears installation.
|
Architects
Akin Ogunkeye & Partners
Electrical Engineers Engr. E.O. Oshokoya
|
22 | The BrethrenChurch Studio Ejigbo. | Professional Audio Sound Recording studio plus acoustic interior arrangement.
(1994) |
Design of Electronics setup, Electrical installation. – conduiting, wiring Electronics and lighting and power electrical works) points, communication equipment design and installation including public address systems, multidirectional studio mike, audio sound mixer, equalizer, reel-reel professional tape recorder, audio amplifier and speakers, etc. | Serv. Engineers:
Engr E.O. Oshokoya |
23. | NICON Project Ikeja. | Reactivation of the electrical power supplies system of the branch office.
Completed (2000) |
Replacement of isolators, supply
cables and upgrading of the supply system (labour only) |
Oshea Projects Ltd |
24. | Mrs. Oladele’s Lakowe (Phase ll.) | Electrical installation for the building project
Completed (1998) |
Conduiting, wiring of sockets and lighting points and installation of fittings and switchgear.
|
M+E Engineers
Connect Point Associates |
25. | OlashoreInt.School, Iloko Telemast Project | Installation of Lightning Protection & Earthing System for Telephone Antenna System.
Completed (1995) |
Installation of Lightning Protection system – air terminal arrestors, mats etc. for the mast antenna system.
|
M+E Engineers
Connect Point Associates |
26. | FGN Prototype Houses. | Electrical installation for the FGN’S Medium Cost Housing units, Yaba Completed
(1996) |
Labour only for the electrification of the building, involving wiring of power and lighting points and controls (labour only)
|
Federal Min. of Works
Project Dept. |
27. | IlokoTownPalace, OshunState. | Electrical Installation Works Rehabilitation.
Completed (1995)
|
Upgrading of cabling system, wiring of sockets, earthing of the electrical system, and lighting points.
|
Architects
APECO Ltd
Services Engineers Oshea Projects Ltd
|
28. | Home Products Limited Isolo. | Electrical installation of the residential building.
Completed(2001) |
Electrical installation – conduiting and wiring for the private residential bungalow.
|
Architects
Klif Consultants
M+E Engineers Building Consultants |
29. | OlashoreInt.School, Iloko – Ijesha. | Reactivation of electrical switchgears and supply cable | Replacement of electrical switchgears and Distribution Boards, and also the upgrading of supply cable
|
|
30. | OlashoreInt.School, Iloko – Ijesha. | Electrical Installation for the Senior Female Hostel Completed(1997) | Electrical Installation – conduiting, wiring of sockets and lighting points and installation of fittings and switchgears |
-Ditto – |
31. | Mr. & Mrs. A. Oladele
VGC – Lekki |
Supply & Installation of light fittings for the Residential Development at Lekki.
Completed(1997) |
Supply and installation of light fittings for the MainBuilding and Boy’s Quarters at Victoria Garden City. Lekki.
|
Services Engineers
connect point associates |
32. | Mr. A. O. R. Oladele Abuja | Supply (only) of electrical light fittings for the residential building at AbujaCompleted (1997) | Supply of Electrical Light Fittings for the Residential Building at Abuja.
|
Oshea Projects Ltd |
|
||||
33. | Commerce Bank Plc. | Computer site preparation for Abuja&Onitsha branches.
Completed (1994) |
Planning and installation.
|
|
34. | Alsteg & Midlands / FAAN. | Rehabilitation of Air Navigational Aids Systems & Devices, etc. MuritalaMohammedInternationalAirport, Ikeja.
Completed (1998) |
A sub-contract “installation only” works under Alcatel / Alsteg & Midlands for FAAN. Installation of RMU, transformers and cable jointing.
|
Architects :
FAAN, Projects Dept.
Serv. Engineers: FAAN, Electrical Engineering Dept., MMIA |
35. | Morpol International Corporation Limited | Electrical and Mechanical Installation Services at Mr. A. Oladele’s Residence
Completed (1998) |
Electrical Services – Wiring, Installation of Fittings, Telephone / Intercom Network, CCTV, Video Door Phone, Central TV & Cable Satellite System,
Mechanical Services – Installation of Air-conditioning Units etc. |
Services Engineers Morpol/Oshea Projects Ltd |
36. | Channel View Estate, Residential Development, Calabar | Electrical Installation for the MainBuilding, Guest Chalet and the Boy’s Quarters
Completed (1999)
|
Electrical Installation – conduiting, wiring of sockets, earthing of the electrical system and switchgears.
Close Circuit TV, Burglary Alarm / Security System. Telephone Network. |
Architects :
Klif Consultants Ltd
Serv. Engineers: Building Consultants Ltd |
Channel View
Estate, Residential Development, Calabar
|
Mechanical (Plumbing) Installation Works for MainBuilding, Guest Chalet & BQ Completed
(1998)
|
Comprehensive on cold/Hot water Piped System. Waste & Drainage and Special Appliances like Jacuzzi, Hand-driers, Water Booster Pumps, etc.
|
ArchitectsKlif Consultants Ltd.
Serv. Engineers: Building Consultants Ltd.
|
|
37. |
– Same – |
Mechanical (Plumbing) Installation Works for MainBuilding, Guest Chalet & BQ.
Completed (2000)
|
Comprehensive works on Cold / Hot Water Piped System. Waste & Drainage and Special Appliances like Jacuzzi, Hand-driers, Water Booster Pumps, etc.
|
|
38. | OlashoreInt.School, Iloko – Ijesha. | Electrical Installation for the Senior Male Hostel
Completed (1996) |
Electrical Installation – conduiting, wiring of sockets and lighting points and installation of fittings and switchgears.
|
Architects :
Klif Consultants Ltd
Serv. Engineers: Building Consultants Ltd |
39. | Prince Bimbo Olashore – Dany Estate, Makoko | Reactivation of external light fittings. Completed(1997) | Replacement of Area illumination and Bollard Light Fittings, together with the supply cable.
|
Ditto |
40. | OlashoreInt. School,
Iloko – Ijesha |
Power Supply Connection to Classroom and Bungalow
Completed(1998) |
Power Supply Connection to 2nos Classroom Blocks and 1no Bungalow of 2 flats.
|
Ditto |
|
||||
41. | Globestar Engineering Services Company, Akin Olugbade, VictoriaIsland. | Rehabilitation of High Tension 33KV Overhead Lines Network, Eket, AkwaIbomState.
(Consultancy Services) |
Project Design, Management and Supervision of On-Site Contractor on behalf of Client for Esit Eket Community and Mobil Oil Producing. |
Services Consultants BCL/Engineer Oshokoya |
Completed (1998)
|
||||
42. | Nahman Construction
And Real Estate Co. Ltd. Louis Solomon Close, Victoria Island |
ECOWAS Residential Estate Project at Abuja
(Electrical & Mechanical Services Completed |
Electrical and Mechanical Installation Services for the buildings (labour only)
|
Architects
AIM Consultants Ltd
M&E Engineers AIM Consultants Ltd
|
(2000) | ||||
43. | National Oil & Chemical Marketing Co. Plc. | Electrical Systems Rectification for 3nos Pump Stations at Calabar
Completed (1999) |
Reactivation of lighting points, load balancing and earthing.
|
National Oil & Chemical Marketing Co. Plc |
44. | National Oil & Chemical Marketing Co. Plc. | Electrical Systems Rectification for 3nos Pump Stations at Calabar
Completed (1999) |
Reactivation of lighting points, load balancing and earthing.
|
National Oil & Chemical Marketing Co. Plc |
45. | Oba Oladele Olashore Villa. Iloko – Ijesha | Residential Building Renovation (Electrical & Mechanical Services)
Completed (1999)
|
Electrical Installation Services – conduiting, wiring of lighting & power points, etc.
Mechanical Installation Services – piping works and installation of mechanical fittings
|
Architects
Klif Consultants
Serc. Engineers Building Consultants Ltd |
46. | Mr. Adeniyi Opeodu | Residential Development at Abimbola Close, Fadeyi, Lagos.
Design and Installation (Electrical & Mechanical Services) completed (1999) |
Electrical Installation Services including fittings
Mechanical Installation Services including fittings.
|
Architects:
APECO Ltd
Services Engineers: Oshea Projects Limited |
47. |
LSDPC [I] |
Completion of Block of Lower Medium Flats at Ojokoro Housing Estate. – Block 121
6nos – 2 bedroom flat Completed (2000) |
Building Construction Works including roofing, painting, etc.
Electrical and Mechanical Installation Services including fittings.
|
LSDPC Project Team |
48. | LSDPC | Construction of 4 units Terrace (Duplexes) Houses at Rabiatu Thompson Crescent, Shitta
Surulere. completed (2001) |
Electrical Installation Services including fittings
Mechanical Installation Services including fittings.
|
LSDPC Project Team |
49. | Ministry of Housing (LASG) | Construction of 2nos Twin Millennium Bungalow in Alliance Housing Scheme, Ikorodu
Completed (2001) |
Electrical Installation Services including fittings
Mechanical Installation Services including fittings.
|
Ministry of Housing
(LASG) |
50. | Engr. Segun Kehinde | Residential Development at Magodo, Lagos
completed (2002) |
Electrical Installation Services conduiting, wiring of lighting and power points including fittings.
|
Architects:
Arch & Planners
Serv. Engineers: Oshea Projects Ltd |
51. | Redeemed Christian Church of God, Gbagada
|
Electrical Installation for Newly Constructed ChurchBuilding
Completed (2003) |
Electrical Installation Services
(Phase 1)
|
Architects :
Klif Consultants
Serv. Engineers:Building Consultants Ltd. |
52. | Marlum Nigeria Ltd [I] | Refurbishment of Expatriates Residential Quarters, Ebutte – Metta
Completed (2002) |
Electrical Installation Services | Design Engineers
Oshea Projects Ltd |
53. | Marlum Nig. Ltd. | Renovation of FirstBaptistChurch, Broad Street, Lagos
Completed (2000) |
Electrical Installation Services
– Completion of Works
|
ArchitectsFirstBaptistChurch Projects Dept.
Serv. Engineers: Engr. Tunde Amusan |
54. | Marlum Nig. Ltd. [III]
|
Consultancy Services for SAIMA Nigeria Limited.
(2001)
|
Design Specification, Drawings and Production of Bill of Quantities
|
Engineer E.O. Oshokoya |
55
|
Chief A. Okoigun’s | Country Home for Mr. Okoigun
At Ewu, EdoState (Electrical & Mechanical Services) |
Electrical And Mechanical Services Installations | Architects :
Klif Consultants
Serv. Engineers:Building Consultants Ltd |
56. | NNPC, IBADAN | Electrification of the marketersBuilding and the Outer Gate.
completed (2001) |
Electrical Installation Services
|
NNPC |
57 | AKRON Nigeria Limited, LAGOS | Milk Powder Repackaging Facility, Oregun Road, Ikeja.
(Electrical and Mechanical Services) completed (2003) |
Electrical and Mechanical Installation Services for the factory
|
Architects:
Space & Place
Serv. Engineers: Shell Concepts (Consulting)
Quantity Surveyors: Folmark Partnership |
58. | Choizcom, Ikeja | Electrical Installation Works
Completed (2003) |
Provision of Earthing System for Telecommunication Equipment. | |
|
||||
59. | PIBE Limited
Opebi, Ikeja |
Office Development for Messrs Adekanola & Associate at Opebi | Electrical Installation Services | |
60 | Chief A. Okoigun’s | Country Home for Mr. Okoigun
At Ewu, EdoState (Electrical & Mechanical Services) |
Electrical And Mechanical Services Installations | Architects
Klif Consultants
Serc. Engineers Building Consultants Ltd |
61. | Choizcom, Ikeja | Electrical Installation Works | Provision of Earthing System for Telecommunication Equipment.
|
Oshea Projects Ltd |
62. | PIBE Limited
Opebi, Ikeja |
Office Development for Messrs Adekanola & Associate at Opebi
(2003) |
Electrical Installation Services
|
|
63. | Lead Merchant Bank | New Head Office Block Electrical System Design. (1990) | Electrical services lighting power Lightning protection & Earthing and fire. Alarm System conceptualized and designed for the Bank. Specification / recommendation for UPS Stabilizer units for the system network. | |
|
||||
64. | Lead Merchant Bank | Head Office Block, Electrical services installation works. (1990) | Commissioned to carry out all works as per designed (including Computer Site electrical wiring and Fire Alarm) | |
65. | Lead Merchant Bank Limited. V/Island. | Lightning protection & Earth scheme.
(1993) |
2nos. phase of the installation
|
Engr. E.O. Oshokoya |
66. | Lead Merchant Bank Limited V/Island. | Electrical wiring for new office blocks and up grading of central power supply system.
Completed(1993) |
2nos. additional office blocks erected
Electrical Services provided (design and supervision only).
Reassessment of load demand, design and execution of upgraded power supply scheme including supply and installation of 250KVA standby power, MV panel and cabling. |
Architects
APECO Ltd
Serv. Engineers. Engr. E.O. Oshokoya. |
67. | Lead Merchant Bank Limited. V/Island. | Fire Alarm System & Clipping / Arresting of destructive over-voltages in power supply.
Completed(1993) |
Extensive investigation study conducted and 2nos. bound report and recommendation submitted to client.
Supply & Installation of Electronics System Protective devices and earthing. |
Ditto |
68. | Lead Merchant Bank Limited V / Island | Olashore’s Villa, Parkview, Ikoyi. Upgrading & Rectification of electrical faults. Completed. (1994) | Electrical Installation – Rewiring of power outlets and lighting points. Power supplies rearrangements and upgrading.
|
Ditto |
69. | Lead Merchant Bank | Renovation of Head office block at v/Island. –Electrical and Mechanical Installation Works.
(Completed) 1994. |
Rewiring part of the existing floors and new office blocks at the banks head office.
Upgrading of toilet wares and general mechanical installation services. Site preparation for computer network, provision of air-conditioned power supply. |
-Ditto – |
70. | Lead Merchant Bank Limited V. Island | Head Office Refurbishment (Electrical & Mechanical Services) | Electrical Installation Services – conduiting, wiring of lighting and power points.
Mechanical Installation Services – supply and installation of air-conditioning units |
-Ditto – |
71. | Lead Bank Plc,
Ikeja GRA |
Installation of Transformer and Lightning Protection System
Completed (2003) |
Supply and Installation of 100KVA Transformer and Lightning Protection System.
|
ArchitectsA.T. Onajide Architect Ltd
Serv. EngineersOJ & T Consulting |
72. | Ministry of Education
(LASG) |
Construction of 2unit Classroom Blocks at ExpressSecondary School, Tolu Schools Complex,
Ajegunle |
Building construction works including roofing, painting and carpentry works | |
73. | Metropolitan Bank Limited, Victoria Island | Refurbishment of Head Office Annex at Idowu Taylor Street, VictoriaIsland
Completed (2003) |
Electrical and mechanical Installations (Internal)
Painting (Internal) and Masonary/Carpentary Works
|
Architects:
Archiscope Limited
M+E Engineers: Oshea Projects Limited
|
74. | Metropolitan Bank Limited, Ikorodu Branch | Renovation of Branch Office at Ikorodu, Lagos
(Civil, Electrical and Mechanical Services) Completed (2003) |
Construction, Electrical and Mechanical Installation Services
|
Architects:
Archiscope Limited
M+E Engineers: Oshea Projects Limited |
75. | Metropolitan Bank Limited, Victoria Island | Head Office Refurbishment (Building Services) | Installation of Long span Aluminum Roofing | – Ditto– |
76. | Metropolitan Bank Limited,
Ojodu Branch |
Electrical Power Distribution System
completed (2003) |
Installation of 200KVA Transformer and Electrical Connection
|
– Ditto – |
77. | Chartered Institute Of Bankers Of Nigeria | Electrical Installation Services.
completed (2003) |
Provision of Power supply For split Unit Airconditioners to Replace The Existing Central Unit | Engineers:
Oshea Projects Ltd |
78. | Chartered Institute of Bankers of Nigeria Bankers’ House,
V.I Lagos |
Electrical Installation Services
(completed (2004) |
Replacement of 1200A MV Auto Mains Failure Panel
|
– Ditto –
|
79. | Intercontinental Bank Plc.
Lokoja Branch |
Branch Development at Lokoja for Intercontinental Bank Plc.
Completed (2005)
|
Electrical Services Installation
(Power, Lighting, Earthing & Lightning Protection)
|
Architects:
Aina + Associates Design Ltd
Serv. Engineer: Bellworth Consult |
80. | Intercontinental Bank Plc.
Ado – Ekiti Branch |
Branch Development at Ado Ekiti for Intercontinental Bank Plc.
Completed (2005)
|
Electrical Services Installation
(Power, Lighting, Earthing & Lightning Protection)
|
Architects:
Don J. Designs
Serv. Engineer: Shell Concepts (Consulting) |
81. | Intercontinental Bank Plc.
Asaba Branch |
Branch Development at Asaba for Intercontinental Bank Plc.
Completed (2004) |
Electrical Services Installation
(Power, Lighting, Earthing & Lightning Protection)
|
Architects:
Optiplan Partnership
Services Engineer: Optiplan Partnership |
82 | Intercontinental Bank Plc.
Ogbomosho Branch |
Branch Development at Ogbomosho for Intercontinental Bank Plc.
Completed (2006) |
Electrical Services Installation
(Power, Lighting, Earthing & Lightning Protection)
|
Architects:
Constaraad Design Ltd
Serv. Engineer: A + O Associates |
83. | Mr.B. Ekunjimi | Residential Development at Gbagada, Lagos
Completed (2003) |
Electrical Installation Services
|
Architects & Serv. Engineer:
House Masters Limited
|
84. |
Delta Shores ProtectionAnd Dredging Limited (Petrotech), Victoria Island |
Modification (Upgrading of Building Structures and Electrical Services at Lekki )
Completed (2003) |
Conversion/ Interior Refurbishment (Builders’ Works, Electrical & Mechanical)
|
Architects:
Runoscape Partners
Services Engineer: Oshea Projects Ltd |
85. | IDDO Plastics Ltd,
Ijora Causeway. |
Electrical Installation Services for Newly Constructed Factory
Completed (2004) |
Electrical Installation Services/Maintenance Services for the factory. Design & Installation 800A MV Panel, HighBay discharge lights, etc |
Design Engineers:Oshea Projects Ltd |
86. | OFARP Manufacturing & Chemical Marketing Company Limited,
Lakowe |
Warehouse Development for OFARP at Lakowe
Completed (2005) |
Project Management (Coordination of Consultants’ and Contractors activities, administration of logistics and management of funds on behalf of the Client). Factory Electrical & Mechanical Services-Design& Installation. Supervision of Steel Structure Fabrication and Main Builder’s Works. Final direct execution of Electrical and Mechanical installation 800A MV Panel and High Bay Lights.
|
Architects Formwork Ltd
M&E Engineers Oshea Projects Ltd |
87. | Mr & Mrs Olu Priddy
|
Residential Development at Phase 1 Lekki, Electrical Services Installations.
(Completed) |
Electrical Installation Services
|
Architects :
Klif Consultants
Serv. Engineers: Building Consultants Ltd. |
|
|
|||
88. |
Chief Ayo Adebanjo |
Residential Developments |
||
a) | at Lekki Phase 1 Lagos
Design and Installation (Electrical and Mechanical Services) completed (2005) |
Design of Electrical & Mechanical Services for the building. Installation work for Electrical services lighting power Central TV System Cable Satellite power supply, lightning Protection and Earthing System.
|
Architects:
Archit-Combined Ltd
Services Engineer: Oshea Projects Ltd |
|
b) | Chief Adebanjo
Ijebu, OgunState |
Electrical and Mechanical Maintenance works
|
Rectification of Electrical and Mechanical Installation systems | Serv. Engineers
Oshea Projects Ltd |
89. | First Consultants
Medical Centre Ltd |
Residential Housing Estate Development at Plot 1034, Utako District, FCT, Abuja
(7 Blocks) 2005 completed (2005) |
Electrical and Mechanical Services Installation;
· Overhead cold water storage (Braithwaite Tank) with associated steel gantry support at 12metre height. · External cold water pipes installation including fire hydrants, water meters etc.for entire Estate. · Internal installation works for 7 blocks of 4 Bedroom terraced buildings (Electrical & Plumbing)
|
Architects:
Amarch Consultants
M&E. Engineers Kunle Ogunbayo & Associates |
90 | Mrs Deola Sagoe | Development at Plot 292, Ajose Adeogun Street, V/Island.
Completed |
Electrical Services Installation
|
Architects :
Klif Consultants
Serv. Engineers: Building Consultants Ltd. |
91 | Rerwod Holding Nigerial Limited | Replacement/ Modification of existing Kitchen Sinks at various Platforms for Chevron Nig. Plc. Additionally the Installation of new kitchen sink with macerating machine
completed (2005) |
Mechanical & Electrical Services works. | Serv. Engineers:
Oshea Projects Ltd |
92 | FAJ Estates Ltd. | Luxury Flats Private 4- Floor (high rise) Development at Lekki Phase 1, Lagos
Completed (2008)
|
· Project Management (Coordination of Consultants’ and Contractors activities, administration of logistics and management of funds on behalf of the Client).
· Electrical & Mechanical (Airconditioning, Gas and Plumbing) Consulting Services-Design& Supervision. · Contract Execution Works. Electrical & Mechanical Services Installation Sub-Contract Works, including installation of 6-person car lift, water treatment plant and other external infractstructural services.
|
Architects Grid & Associates
Project Manager Engr. E.O. Oshokoya (Connect Point Associates)
M&E Engineers Connect Point Associates |
· | ||||
93 | Intercontinental Bank Plc.
Lagos. |
Branch Development at Maroko, VictoriaIsland for Intercontinental Bank Plc.
Completed (2006)
|
Electrical Services Installation
(Power, Lighting, Earthing & Lightning Protection)
|
Architects:
Aina + Associate
Serv. Engineer: Bellwort (Consulting) |
94 | Intercontinental Bank Plc.
|
Branch Development at University of Nigeria Nsukka, Enugu for Intercontinental Bank Plc.
Completed (2007)
|
Electrical Services Installation
(Power, Lighting, Earthing & Lightning Protection)
|
Architects:
Optiplan Partnership
Serv. Engineer: Optiplan Partnership (Consulting) |
95 | Intercontinental Bank Plc.
|
Branch Development at Obosi, Anambra for Intercontinental Bank Plc.
Completed (2007)
|
Electrical Services Installation
(Power, Lighting, Earthing & Lightning Protection)
|
Architects:
Omuabuild
Serv. Engineer: Omuabuild (Consulting) |
96 | Dove Court Phase 2, Utako District Abuja. | Residential Housing Estate Development at Plot 1034, Utako
District, FCT, Abuja (6 Blocks) Completed
|
Electrical and Mechanical Services Installation;
· Internal installation works for 6 blocks of 4 Bedroom terraced buildings (Electrical & Plumbing, A/C Installation Service)
|
Architects:
Amarch Consultants
M&E. Engineers Kunle Ogunbayo & Associates |
97 | Intercontinental Bank Plc. | Otedola School of Maritime Studies & Information Technology for YabaCollege of Technology at Epe
Completed (2008) |
Electrical Services Installation
(Power, Lighting, Earthing & Lightning Protection)
|
Architects:
Architect Design Centre
M&E. Engineers Q – Tech Engineering Limited |
|
||||
98 | Intercontinental Bank Plc. | Branch Development at Muri Okunola Street, VictoriaIsland for Intercontinental Bank Plc.
Completed(2008)
|
Electrical Services Installation
(Power, Lighting, Earthing & Lightning Protection) |
Architects:
Aina + Associates Design Ltd
M&E. Engineers Dessco Dependable Eng. Services Limited |
99 | Intercontinental Bank Plc. | Branch Development at Okere-Warri, Delta for Intercontinental Bank Plc.
Completed
|
Electrical Services Installation
(Power, Lighting, Earthing & Lightning Protection) |
Architects:
Optiplan Partnership
Serv. Engineer: Optiplan Partnership (Consulting) |
100 | Chellarams Plc | Development/Renovation of factories, showroom and offices for Chellarams Plc, Aswani, Isolo, Lagos.
Completed(2009) |
Electrical Services Installation( Power,Lighting, Industrial Sockets, Earthing and Lightning Protection) | Architects:
Klif Consultants
Services Engineer: Building Consultants Limited |
101 | Principal Associates | Mixed-Use Development at Plot 8, Block 54, Lekki Phase 1, V.I, Lagos
Ongoing |
Mechanical And Electrical Installations (Power, Lighting, Plumbing, A\C Installation Services) | Architects
Amarch Consultants
Services Engineer A+O Associates |
102 | Craddle Ventures Limited | Residential Development for Craddle Ventures Limited at Plot 13, Block 2, Onikoyi Residential Scheme, Parkview, Ikoyi, Lagos | Mechanical Services Installations (Pipeworks for cold and hot water, soil and drainage system, Air Conditioning System, Installation of sanitary wares) | Architects
GYB Consults Limited
Services Engineer A+O Associates |
103 | Intercontinental Bank Plc | Branch Development at Ijebu-Ode, Ogun State
completed |
Electrical Services Installation ( Power, Lighting, Earthing And Lightning Protection) | Architects:
Constrad Designs
Services Engineer A+O Associates
|
104 | Bank Of Industry | Office Development for Corporate Headquarters, Bank of Industry.
Abuja, Nigeria |
Electrical Services Installations (HT Panel, Transformers, Generators, CCTV/Fire Alarm System) | Architects:
Shelter Design partnership
Serv. Engineer: Aldeen Associates |
105 | Intercontinental Bank Plc | Branch Development at Kaura Namoda, ZamfaraState.
completed |
Electrical Services Installation (Power, Lighting, Earthing And Lightning Protection, 100KVA Transformer) | Architects
GYB Consults Limited
Services Engineer Power Fields Consulting |
|
||||
106 | Intercontinental Bank Plc | Branch Development at Bukuru, Plateau State.for IBPLC.
Completed(2008)
|
Electrical Services Installations (HT Panel, Transformers, Power,Lighting, Industrial Sockets, Earthing and Lightning Protection) |
Services Engineer Azton Associates |
107 | Intercontinental Bank Plc | Branch Development at Ayingba, Kogi State.for IBPLC.
Completed(2008)
|
Electrical Services Installations (HT Panel, Transformers, Power,Lighting, Industrial Sockets, Earthing and Lightning Protection) |
Services Engineer Azton Associates |
108 | US Embassy
Abuja |
Upgrading of Electrical Installations in CDC Office,
FCMBPlaza, CBD, Abuja |
Lightning Fittings, Power Accessories and Main Power Rehabilitation Works | Contracting Officer
US Embassy |
109 | Grace Court Estate, Makoko, Yaba, Lagos. | Residential Housing Estate Development Makoko Yaba
Lagos Completed
|
Electrical and Mechanical Services Installation;
· Internal installation works for 6 blocks of 4 Bedroom terraced buildings (Electrical & Plumbing, A/C Installation Service)
|
Architects:
Amarch Consultants
M&E. Engineers MFA Partnership Power Fields Consultant |
Grace Court Estate, Makoko, Yaba, Lagos.
|
Residential Housing Estate Development Makoko Yaba
Lagos Completed |
4 Bedroom Semi detached buildings (Electrical & Mechanical Services) |
Architects:
Amarch Consultants
Mech. Engineers MFA Partnership Power Fields Consultant |
|
110 | Grace Court Estate, Makoko, Yaba, Lagos.
|
Residential Housing Estate Development Makoko Yaba
Lagos Completed
|
Mechanical Services installation for External works (piping), 200,000L GRP surface tank and 32,000L overhead tank. | Architects:
Amarch Consultants
Mech. Engineers MFA |
111 | Grace Court Estate, Makoko, Yaba, Lagos | Residential Housing Estate Development Makoko Yaba
Lagos Completed
|
Installation of sewage and Water treatment Plants. | Architects:
Amarch Consultants
Mech. Engineers MFA Partnership |
112 | Grace Court Estate, Makoko, Yaba, Lagos | Residential Housing Estate Development Makoko Yaba
Lagos Completed
|
Mechanical and Electrical installations for 8 units of Maisonnette blocks. | Architects:
Amarch Consultants
Mech. Engineers MFA Partnership |
113 | Debim Mart | Residential Development for Debim Mart at Parkview Estate Ikoyi –Lagos.
Ongoing |
Electrical Installation Services
|
Architects :
Klif Consultants
Serv. Engineers: Building Consultants Ltd. |
114 | New Heritage Baptist Church | Development for New Heritage Baptist Church at Femi Adebule Street, Shomolu Lagos. | Mechanical Services Installations (Pipeworks for cold and hot water, soil and drainage system, Installation of sanitary wares) | Architects :
Envohygienix Architects
Serv. Engineers: Mecholect Engineering Assoc. |
115 | UCKG | Development for Universal Church of Kingdom of God, Opebi Lagos | Mechanical And Electrical Installations (Power, Lighting, Earthing & Lightning Protection Plumbing, Central A\C Installation Services) | Architects :
Adeniyi Coker Consultants Ltd
Serv. Engineers: MFA Partnership |
116 | NEBC | Renovation of New Estate Baptist Church at Surulere Lagos. | Electrical Installation Services
|
|
117 | Space Online | Development for Mr Rasheed A. Lawal at Agbeke Sanyaolu Street Osapa Village | Electrical And Mechanical Services Installation | Architects :
Space Online
Serv. Engineers: Power Konnect Point Associates’ |
118 | State House Medical Centre | Rehabilitation / Extension of State House Medical Centre, Asokoro, Abuja: | Mechanical Services Installation
(Pipeworks for cold and hot water, soil and drainage system, Installation of sanitary wares) |
Architects :
Ade Ojuri & Partners
Serv. Engineers: Series-A- Konsultants |
119 | U.S Embassy Lagos | Consulate Office Building. Rehabilitation/Additional & Compound Security | Electrical Service Installation | Serv. Engineers:
Montage Incorporated USA . |
120 | Habitat Trust Limited | Residential Development at VGC for TY Holding | Electrical and Mechanical Services Installation works | Project Manager
Consol Associates
Serv. Engineers: Power Konnect Point Associates’ |
121 | Mrs Ayodele Soyode | Residential Development at Plot P68 Zone P Banana Island Ikoyi. Lagos. | Electrical And Mechanical Services Installation. | Architects :
Amarch Consultants
Serv. Engineers: Power Fields Consulting |
122 | OLAM Nigeria limited | Proposed Cashew Processing, Factory At Ogbodoroko Kwara State.
|
Mechanical Installation: Addendum Contract for Diesel Tanks, Pumps, Pipe Connections and Ancillaries. | Architects :
Ade Ojuri & partners
Mech. Engineers: Projects + Potentials |
123 | Bimto Enterprise | Proposed Development at G.R.A, Abijo, Lekki, Lagos. | Mechanical And Electrical Installations (Power, Lighting, Plumbing, A\C Installation Services) | Architects:
Amarch Consultants
M&E. Engineers: A+O Associates |
124 | Stock Banc | Office Development at Lekki Phase 1, Lagos | Design Specification and Drawing.
Electrical & Mechanical Installations (Power, Lighting, Plumbing, A\C Installation Services) |
Architects:
Amarch Consultants
Serv. Engineers: Power Konnect Point Associates |
125 | Weston-Shaba | Proposed Development Weston-Sheba Park at Ajiran Village, Lekki Lagos. | Project Management (Coordination of Consultants’ and Contractors activities, administration of logistic and management of funds on behalf of the client).
Electrical & Mechanical (Airconditioning, Gas and plumbing) Consulting Services-Design & Supervision. |
Architects:
Amarch Consultants
Serv. Engineers: Power Konnect Point Associates |
126 | Banksway International Ltd | Proposed Residential Development at Cadastral Zone A5 Maitama Abuja, Abuja | Mechanical Services Installation (Pipe works for cold and hot water, soil and drainage system, installation of Sanitary wares) | Architects:
Living Concept Ltd Serv. Engineers: Wisegate Engineering Ltd. |
127 | Genesis Sojourner Limited | Proposed Remodeling Development of Genesis Court at 16, Oba Akinjobi Street Ikeja GRA. | Mechanical And Electrical Installations (Power, Lighting, Plumbing, A\C Installation Services) internal and external. | Architects:
Housetop Architect
M&E. Engineers Technomec Consult
|
128 | Skye Bank Plc | Proposed Refurbishment for Skye Bank Branch at Minna, Niger State. | Mechanical & Electrical Services Installation
(Power, Lighting, Earthing & Lightning Protection) |
Architects:
Project Point Limited
Serv. Engineers: E-M Engineers Limited |
129 | CONDITION /FIT FOR PURPOSE SURVEY | NIGERIAN NAVY
Apapa- Lagos |
Electrical and Electro Mechanical Engineering Audit and Testing Services
Completed (2007/2008) |
NIGERIAN NAVY |
130 | OLAM Nigeria limited | Proposed Cashew Processing, Factory At Ogbodoroko Kwara State. | Construction of Production Gantry extension, Silo partitioning, Fabrication on Discharging pan and funnel |
|
131 | Thirty Five Cameron Court Ltd | Proposed office Complex Renovation at Sanusi Fafunwa Street V/I Lagos. | Electrical Service Installation, Lightning Fittings, Power Accessories and Main Power Rehabilitation Works. | Architects:
Consultants Collaborative Partnership (CPP)
|
132 | OlashoreInt.School, Iloko – Ijesha. | Rehabilitation works on existing Installations. | Electrical Installation Services (Replacement of electrical switchgears and Distribution Boards, and also the upgrading of supply cable)
|
Serv. Engineers:
Power Konnect Point Associates |
134 | Mr. & Mrs Balogun Bamidele & Co | Residential Development at Remi Fanikayode Street, GRA Ikeja
Ongoing
|
Mechanical And Electrical Installations (Power, Lighting, Earthing & Lightning Protection Plumbing, Central A\C Installation Services) | Architects:
Housetop Architect
M&E. Engineers CSA Engineering
|
135 | OCEAN SPRINGS | Residential Development for Ocean Spring Estate at Ruxton Rd, Ikoyi Ongoing | Mechanical Services Installation
(Pipeworks for cold and hot water, soil and drainage system, Installation of sanitary wares) |
Architects:
Designer8iR
M&E. Engineers Q-Tech
|
136 | SYLE LIMITED | Residential Development for Syle Limited, Banana Island, Lagos | Electrical Services Installation | Architects:
Projectpoint Limited
M&E. Engineers Petoba Engineering Services
|
137 | MRS ROSELYNE DAFINONE | Residential Development At Oniru Estate, lagos | Mechanical Services Installation
(Pipeworks for cold and hot water, soil and drainage system, Installation of sanitary wares) |
Architects:
Amarch Consultants.
M&E. Engineers Powerfield Consulting ltd
|
138 | DELKOLT MULTICONCEPTS LIMITED | Creek Haven Estate Development For Delkolt Multiconcepts Limited, Ikota, Lekki, Lagos | External infrastructure works: Pipe Reticulation Service for water, sewer, hydrant and electrical services
Completed |
Architects:
Amarch Consultants.
M&E. Engineers Shell Concepts limited
Project Managers Pinconsults Nigeria Limited
|
139 | MR. BISMARK REWANE | Residential development For Mr. Bismark Rewane At Lekki Phase 1, Lagos | Mechanical Services Installation
(Pipeworks for cold and hot water, soil and drainage system, Installation of sanitary wares) Completed |
Architects:
Amarch Consultants.
M&E. Engineers Powerfield Consulting Ltd
|
140 | MRS. JOY OKEBALAMA | Residential development For Mrs. Joy Okebalama At Chevron Foreshore, Lagos | Electrical And Mechanical Services Installation Works.
Completed |
Architects:
Amarch Consultants.
M&E. Engineers A+O associates
|
141 | STRONGATE LIMITED | Strongate Avenue Development, Ojora Road, Ikoyi | Mechanical Services Installation
(Pipeworks for cold and hot water, soil and drainage system, Installation of sanitary wares) Completed |
Architects:
Arc-tech Projects Ventures
M&E. Engineers Project Engineering Services
|
142 | CONDITION /FIT FOR PURPOSE SURVEY | LANDFALL TRANS & TOWAGE COASTAL & MARINE SERVICES | Electrical and Electro Mechanical Engineering Audit and Testing Services
Completed (2015) |
LANDFALL TRANS & TOWAGE COASTAL & MARINE SERVICES |
143 | First Hydrocarbon Nigeria (FHN) | OML26 Community Electrification Project (Engineering Audit) | Engineering Audit- (Scope of work)
Electrical · Review of the technical/commercial proposal submitted. · Approval of final technical /commercial proposal. · Review of all Electrical installations, fault and protection scheme. · Review of procurement process and procured items. · Review of Electrical designs, specifications & construction. · Project close out report. · Review and supervision of CNG+Power Installations. · Review and confirmation of all technical tests. · Review and submission of project engineering review report. · Metering units · Integrated plot CCTV system specification · Complete telecoms systems. · Lighting system (Internal & External) Mechanical Review complete DED for the following: · Water treatment plant · Fire & Gas System · Utility systems: (portable water, Diesel, nitrogen and their distribution to service points. · Waste management system · Drainages · Piping layout |
|
144 | THE LATTER RAIN ASSEMBLY | Multipurpose Development For The Citadel of The Latter Rain Assembly, Oregun, Lagos | Electrical Services Installation including High and Low voltages including Supply and Installation of generators
Completed (2020) |
Architects:
AMA Designs
M&E. Engineers Kunle Ogunbayo Associates
|
145 | CREDIT DIRECT LIMITED | Proposed Credit Direct Limited, Isaac John, Ikeja G.R.A. Lagos. | Electrical & Mechanical Services Installation Works
Completed (2019) |
Architects:
NLE Works M&E. Engineers MFA Partnership |
146 | ATLANTIC HALL SCHOOL | Boys Hostel Development for Atlantic Hall School Poka- Epe, Lagos |
Electrical & Mechanical Services Installation Works – Completed (2020) |
Architects: Studio Imagine. Simply Architecture (SISA) M&E. Engineers Consultants Collaborative Partnership |
147 | ATLANTIC HALL SCHOOL | Girls Hostel and Admin Block Development for Atlantic Hall School Poka- Epe, Lagos |
Electrical & Mechanical Services Installation Works Completed (2022) |
Architects: Studio Imagine. Simply Architecture (SISA) M&E. Engineers Kaydek Associates |
148 | REDEEMRER’S HEALTH VILLAG |
Proposed Redeemers’ Health Village for RCCG at Redemption Camp Ogun State. |
Electrical & Piped Services Installation Works –Completed (2024) |
Architects: AMA Designs Ltd M&E. Engineers KOA Consultants Ltd |
149 | ELIZADE PLAZA | Renovation of Elizade Nigeria Ltd. office Building at Anthony, Ikorodu Road, Lagos | Electrical & Mechanical
Services Installation Completed (2024) |
Architects:
KAA Design
M&E. Engineers Power Konnect Point Associates |